Homeowner guide

Permits and public records

A permit file shows what work was approved and inspected at an address. A license record shows who a contractor is and whether the state has complaints on file. Neither proves good work, but together they make a solid paper trail.

Who is responsible for the permit

The Oregon Building Codes Division says the person doing the work, whether homeowner or contractor, is responsible for getting all needed permits. Permits are required for new construction and for specific alterations, including structural, plumbing, mechanical and electrical changes. Once a permit is issued, it has to be on site for the inspector, along with any approved plans.

If you hire a contractor, your contract should say which permits are needed and who will apply for them. The CCB recommends listing this in the contract, and notes that only licensed contractors can get the required building permits.

How long a permit stays active

BCD’s statewide guidance says a permit expires if work doesn’t start within 180 days of issue, or if work stops for 180 days or more, and that you can ask the local building official for an extension. Local practice can differ. The City of Eugene’s residential permits page gives 360 days to begin construction and extends that each time an inspection is requested. Always follow what your own building department tells you.

Salem: permits and permit history

The City of Salem’s permit guidance (“Determine If You Need a Building Permit”) says a permit is always required for plumbing work, sewer changes, mechanical work (heating, cooling and ventilation), electrical work including adding outlets, and dry rot repair, among other items. Reroofing, fences and siding or window work can need one depending on the circumstances. The Permit Application Center can be reached at 503-588-6256.

To see what has been permitted at a Salem address, the city’s permit and license search page points to an online lookup covering actions after July 1, 2005. It shows the work description, permit status, inspection dates and results, and the names of applicants and contractors. Permits issued before July 1, 2005, actual building plans and inspection forms are available through a public records request. Licensed Salem businesses are listed on our plumbers in Salem and roofers in Salem pages.

Eugene: permits and permit history

The City of Eugene handles electrical, residential mechanical and plumbing permits through its online eBuild system. Per the city’s trade permits page, intake staff review applications within three business days, and the permit issues once fees are paid. For property research, the residential permits page says you can submit a public records request to find a property’s permit history. Building and Permit Services is at 541-682-5086.

Eugene’s FAQ explains why this matters: permits create a permanent record of the work and inspections, and that record will be needed if you sell. If work was done without a required permit, the city says plans can be submitted showing the work, though inspectors may need small sections of wall or roof opened to verify it. For licensed local businesses, see plumbers in Eugene and roofers in Eugene.

Contractor records at the CCB

The CCB license search is the public record for Oregon contractors. Per the CCB, it shows license status and bond, insurance on file, lead-based paint licensing, workers’ compensation coverage, and complaints or disciplinary actions from the past 10 years. You can also call 503-378-4621 about complaint history. The search page also links to the Building Codes Division lookup for electrical and plumbing licenses and the Landscape Contractors Board lookup. Records update every six hours, so save a dated copy of what you relied on when you signed. Our CCB license check links to the search.

If something goes wrong: the CCB complaint process

The CCB’s dispute resolution staff try to help homeowners and licensed contractors reach a settlement. The CCB consumer page lays out the steps:

  1. Send a Pre-Complaint Notice. You must give the contractor 30 days’ notice by certified mail, to the address on record with the CCB, that you intend to file a complaint. The CCB has a form you can use.
  2. File within the deadline. Under ORS 701.143, for work on an existing home, the CCB must receive the complaint within one year after the work was substantially completed. If the contractor never started, the deadline is one year after the contract date. If the contractor stopped before finishing, it’s one year after work stopped. New homes have different deadlines.
  3. Use the right form and fee. Complaints go on CCB forms, and you may pay a $50 processing fee.

The CCB can only help with the dispute if the contractor was licensed during your project. For landscaping work, the Landscape Contractors Board runs its own claim process, with a one-year deadline from substantial completion.

FAQ

Can I look up permits before buying a house?

In Salem, the online lookup covers permit actions after July 1, 2005, and older records are available through a public records request. In Eugene, the city says to submit a public records request for a property’s permit history.

Does a clean CCB record mean a contractor is good?

No. It only means no complaints or discipline appear for the past 10 years. See Choose a contractor.

My contractor says no permit is needed. How do I check?

Compare the job with BCD’s examples and your city’s list, then call the local building department. Our project scope guide covers common examples.

What should I keep after the job?

The contract and change orders, the CCB notices you received, permit numbers and final inspection results, and a dated copy of the contractor’s license record. See also Compare written quotes.

This guide is general information, not legal advice. Deadlines and procedures can change, so check with the Oregon Construction Contractors Board (503-378-4621) and your local building department before you act.

Sources

Last checked: October 11, 2026