A project scope is a one- or two-page description of the job you want done, written before anyone gives you a price. It keeps every contractor bidding on the same work, it shortens site visits, and it becomes the starting point for the “description of the work” that an Oregon residential contract has to include (CCB Contractor Tools). You don’t need technical language. You need to be specific.
Why a scope matters
The Construction Contractors Board lists “not doing your homework” among the common mistakes homeowners make. It suggests planning carefully, setting a budget, collecting pictures of styles and products you like, writing down brand names and models, and showing them to your contractor. Its example is a good one: “high-quality faucets” or “ivory paint” may mean something different to you than to the person bidding.
When every bidder prices the same written description, price differences reflect method and materials rather than guesses about what you wanted.
What to put in your scope
Work through these headings. Skip any that don’t apply.
1. The problem or goal
Describe what is wrong or what you want, and what “done” looks like. “Water stain on the bedroom ceiling below the bathroom, appears after showers” is more useful than “leak.”
2. Location and access
Say where the work is: which room, which side of the house, crawl space or attic. Note anything that affects access, such as steep slopes, a locked gate, a narrow side yard, pets, or a basement reached only through the garage.
3. Measurements and photos
Add rough dimensions (room size, fence length, roof sections) and dated photos, both wide shots and close-ups.
4. Materials and finish level
List known preferences: brand, model, color, grade. If you don’t know yet, say so, and ask each bidder to include an allowance amount you can compare.
5. History of the house and earlier repairs
Note the year the house was built, earlier repairs to the same area, and any work you know was done without a permit. Two dates matter in Oregon:
- Built before 1978: A construction business working on most housing built before 1978 needs a Certified Lead-Based Paint Renovation license tied to its CCB license (Oregon Business Xpress). Putting the build year in your scope lets bidders plan lead-safe work and tells you which license to look for.
- Built before 2004, with demolition: The CCB explains that Oregon DEQ requires an asbestos survey by an accredited inspector before demolishing residential buildings built before January 1, 2004, where demolition means removing a load-supporting structural member such as a bearing wall (CCB Contractor Tools). If your project removes a bearing wall, ask how the survey is handled.
6. Timing and how you’ll live around the work
Give any deadline and why (a sale, a baby, the rainy season). Say whether the home will be occupied, whether you need water or power back each night, and quiet hours.
7. What you want each bid to state
Ask every contractor to list assumptions, exclusions, permits included, cleanup and disposal, and the warranty in writing.
Check permits and land use while you write
Knowing whether a permit is likely helps you write a scope that matches what will be inspected. The Building Codes Division gives examples for detached one- and two-family homes:
- A permit is needed to replace a water heater, or to alter piping inside a wall, ceiling or under a floor.
- Re-roofing needs a building permit when all the old roofing is removed and all new roof sheathing is installed.
- Fences of wood, wire mesh or chain link under 7 feet, gutters and downspouts, and replacing doors and windows with no structural change are examples that don’t need a building permit.
BCD adds that work exempt from a building permit is not necessarily exempt from an electrical, plumbing or mechanical permit, and that local land-use (planning and zoning) rules should be considered first. For yard and fence projects, the City of Eugene notes that property lines are often not at the edge of the street or sidewalk, and a precise location may need a private land surveyor. Our permits and public records guide covers how to look up a home’s permit history.
A short sample scope
Project: Replace gas water heater, Salem single-family home, built 1962.
Problem: 40-gallon tank in the garage is leaking at the base; installed before we bought the house in 2015.
Goal: Same-size replacement in the same spot, haul away old tank.
Access: Garage, side door, no stairs.
Ask each bidder to state: model and capacity, permit included and who applies, venting or seismic strapping changes, disposal, labor warranty, and anything excluded.
FAQ
Do I need drawings?
For small repairs, photos and measurements are usually enough. For projects that need plan review, such as additions or remodels, the City of Eugene says plans must show all intended work and existing conditions, in enough detail that a contractor could build from them.
Should I include my budget?
That’s your call. A range lets bidders suggest options; either way, ask for an itemized quote.
What about tree work?
Say whether you want removal, pruning or stump grinding, and how close the tree is to structures or lines. The Landscape Contractors Board says removal and stump grinding need an LCB or CCB license, while planting trees needs an LCB license. Our tree-removal planner has a checklist.
What’s next?
Send the same scope to each business. Our pages for plumbers in Salem, roofers in Corvallis and roofers in Albany list licensed businesses with their CCB numbers. Then use Compare written quotes.
This guide is general information, not legal advice. Permit and licensing rules vary by property and change over time, so confirm with your local building department and the Oregon Construction Contractors Board (503-378-4621).