Homeowner guide

Write a project scope

A project scope is a one- or two-page description of the job you want done, written before anyone gives you a price. It keeps every contractor bidding on the same work, it shortens site visits, and it becomes the starting point for the “description of the work” that an Oregon residential contract has to include (CCB Contractor Tools). You don’t need technical language. You need to be specific.

Why a scope matters

The Construction Contractors Board lists “not doing your homework” among the common mistakes homeowners make. It suggests planning carefully, setting a budget, collecting pictures of styles and products you like, writing down brand names and models, and showing them to your contractor. Its example is a good one: “high-quality faucets” or “ivory paint” may mean something different to you than to the person bidding.

When every bidder prices the same written description, price differences reflect method and materials rather than guesses about what you wanted.

What to put in your scope

Work through these headings. Skip any that don’t apply.

1. The problem or goal

Describe what is wrong or what you want, and what “done” looks like. “Water stain on the bedroom ceiling below the bathroom, appears after showers” is more useful than “leak.”

2. Location and access

Say where the work is: which room, which side of the house, crawl space or attic. Note anything that affects access, such as steep slopes, a locked gate, a narrow side yard, pets, or a basement reached only through the garage.

3. Measurements and photos

Add rough dimensions (room size, fence length, roof sections) and dated photos, both wide shots and close-ups.

4. Materials and finish level

List known preferences: brand, model, color, grade. If you don’t know yet, say so, and ask each bidder to include an allowance amount you can compare.

5. History of the house and earlier repairs

Note the year the house was built, earlier repairs to the same area, and any work you know was done without a permit. Two dates matter in Oregon:

6. Timing and how you’ll live around the work

Give any deadline and why (a sale, a baby, the rainy season). Say whether the home will be occupied, whether you need water or power back each night, and quiet hours.

7. What you want each bid to state

Ask every contractor to list assumptions, exclusions, permits included, cleanup and disposal, and the warranty in writing.

Check permits and land use while you write

Knowing whether a permit is likely helps you write a scope that matches what will be inspected. The Building Codes Division gives examples for detached one- and two-family homes:

BCD adds that work exempt from a building permit is not necessarily exempt from an electrical, plumbing or mechanical permit, and that local land-use (planning and zoning) rules should be considered first. For yard and fence projects, the City of Eugene notes that property lines are often not at the edge of the street or sidewalk, and a precise location may need a private land surveyor. Our permits and public records guide covers how to look up a home’s permit history.

A short sample scope

Project: Replace gas water heater, Salem single-family home, built 1962.
Problem: 40-gallon tank in the garage is leaking at the base; installed before we bought the house in 2015.
Goal: Same-size replacement in the same spot, haul away old tank.
Access: Garage, side door, no stairs.
Ask each bidder to state: model and capacity, permit included and who applies, venting or seismic strapping changes, disposal, labor warranty, and anything excluded.

FAQ

Do I need drawings?

For small repairs, photos and measurements are usually enough. For projects that need plan review, such as additions or remodels, the City of Eugene says plans must show all intended work and existing conditions, in enough detail that a contractor could build from them.

Should I include my budget?

That’s your call. A range lets bidders suggest options; either way, ask for an itemized quote.

What about tree work?

Say whether you want removal, pruning or stump grinding, and how close the tree is to structures or lines. The Landscape Contractors Board says removal and stump grinding need an LCB or CCB license, while planting trees needs an LCB license. Our tree-removal planner has a checklist.

What’s next?

Send the same scope to each business. Our pages for plumbers in Salem, roofers in Corvallis and roofers in Albany list licensed businesses with their CCB numbers. Then use Compare written quotes.

This guide is general information, not legal advice. Permit and licensing rules vary by property and change over time, so confirm with your local building department and the Oregon Construction Contractors Board (503-378-4621).

Sources

Last checked: October 11, 2026